← Back
RACK STACK

WORK ORDER

The new data center is empty. Rack servers, switches, storage, and power gear into the cabinet before the client deadline -- but only correct rack layouts pass the safety audit.

COMPONENTS

Real racking rules apply. Heaviest gear (UPS Battery) at the BOTTOM for a low center of gravity. Switches and patch panels near the TOP for clean cabling. Fill every gap with a Blanking Panel or the aisle airflow leaks. A row only ships (and scores) if it's a rack-VALID arrangement -- get it wrong and it's flagged, not scored.

STATUS

LEVEL: 1

ROWS SHIPPED: 0

EFFICIENCY: 0

CONTROLS

← → Move component

Rotate

Soft drop

SPACE Hard drop

C Hold

? Show parts

M Toggle sound

0 LV 1
NEXT

ROWS: 0

LEVEL: 1

COMBO: 0

HOLD
← → MOVE | ↑ ROTATE | ↓ SOFT DROP | SPACE HARD DROP | C HOLD | ? PARTS

COMPONENTS

Press ? to close

Course Home